Our site uses cookies. Some of the cookies we use are essential for parts of the site to operate and have already been set. You may delete and block all cookies from this site, but parts of the site will not work. To find out more about cookies on this website, see our Cookie Policy
Accept
© eRevision.uk and ZigZag Education 2025
This test is run by .
Note that your final mark will not be saved in the system.

3.2 Metal based materials Reorder

Target Level
4-5
Running Total
0
0%
Attempt
1 of 3

Drag and drop the boxes into the correct order.



  • The drag is turned over and the cope is added on top.
  • The cope and drag are put back together before the molten metal is poured in.
  • Sprue pins are added to the inverted drag, and sand is packed tightly around them.
  • Sand is sifted over the pattern and compacted.
  • The pattern is laid inside the drag.
  • The cope and drag are separated and the pattern is removed.
  • Channels are cut to allow the molten metal to flow into the cavity.

This is your 1st attempt! The marking algorithm gives more marks for getting the right order first time.

Pass Mark
70%